ABB PVS300 Manual Pagina 64

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 130
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 63
64 Electrical installation
7 Pull lightly to check that the
contact has properly engaged.
8 Insert the test pin with the
corresponding side into the
socket or plug. If the contact is
properly assembled, the white
marking on the test pin must
still be visible.
9 Screw on the cable gland
hand-tight and then tighten it
to the correct torque for the
solar cables used. Typical
values are 2.5 Nm to 3 Nm.
Description
Vista de pagina 63
1 2 ... 59 60 61 62 63 64 65 66 67 68 69 ... 129 130

Comentarios a estos manuales

Sin comentarios