
Starting up fieldbus communication and programming the ABB PLC (one-drive system)
29
Starting up fieldbus communication and
programming the ABB PLC (one-drive system)
What this chapter contains
This chapter presents the steps to take during the start-up of the drive fieldbus
control with ABB AC500 PLC and PROFIBUS DP adapter module. A system with
one drive is set up. For a system where two drives are controlled simultaneously, see
also chapter Starting up fieldbus communication and programming the ABB PLC
(multi-axis systems), page 105.
For more information on the fieldbus adapter module, such as
• mechanical and electrical installation
• PROFIBUS specific parameters
• components
•protocols
see PROFIBUS DP Adapter Module FPBA-01 User’s Manual (3AFE68573271
[English]).
For more information on the PLC, see ABB AC500 PLC manuals.
Safety
WARNING! Follow the safety instructions given in this manual and in the drive
hardware manual.
Comentarios a estos manuales