
Starting up fieldbus communication and programming the ABB PLC (one-drive system)
99
Tool/Step
Running and testing the program
CoDeSys
In this section, you download the program to the PLC. Thereafter, you can run the
program and test it.
Load the program to the controller
1. Turn the drive on with the I/O switch of the demosuitcase.
2. Turn the PLC on with the on/off switch in its demosuitcase. For the location of the
on/off switch, refer to the photo on page 34.
Comentarios a estos manuales