ABB FPBA-01 Manual Pagina 33

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 134
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 32
Starting up fieldbus communication and programming the ABB PLC (one-drive system)
33
– – – TWO - D R I V E S Y S T E M – – –
Set up the communication.
Program the main program to the
PLC.
Program actions to the PLC
program.
Program the visualization.
Run and test the program.
In this section, you program additional function blocks for the
second drive for communication and basic drive control, and
program additional actions and visualizations, and run and test the
program.
Setting up the communication, page 105
Configure communication with the SYCON fieldbus
configurator, page 106
Programming the PLC main program, page 116
Programming actions, page 120
Programming visualizations, page 123
Running and testing the program, page 124
No. Task Description / See instruction
Vista de pagina 32
1 2 ... 28 29 30 31 32 33 34 35 36 37 38 ... 133 134

Comentarios a estos manuales

Sin comentarios